W Hotel , Amman - Jordan

w_ghece10 (85)
w_ghece10 (86)
w_ghece10 (84)
w_ghece10 (87)
w_ghece10 (1)
w_ghece10 (2)
w_ghece10 (3)
w_ghece10 (4)
w_ghece10 (5)
w_ghece10 (6)
w_ghece10 (7)
w_ghece10 (8)
w_ghece10 (9)
w_ghece10 (10)
w_ghece10 (11)
w_ghece10 (12)
w_ghece10 (13)
w_ghece10 (14)
w_ghece10 (15)
w_ghece10 (16)
w_ghece10 (17)
w_ghece10 (18)
w_ghece10 (19)
w_ghece10 (20)
w_ghece10 (21)
w_ghece10 (22)
w_ghece10 (23)
w_ghece10 (24)
w_ghece10 (25)
w_ghece10 (26)
w_ghece10 (27)
w_ghece10 (28)
w_ghece10 (29)
w_ghece10 (30)
w_ghece10 (31)
w_ghece10 (32)
w_ghece10 (33)
w_ghece10 (34)
w_ghece10 (35)
w_ghece10 (36)
w_ghece10 (37)
w_ghece10 (38)
w_ghece10 (39)
w_ghece10 (40)
w_ghece10 (41)
w_ghece10 (42)
w_ghece10 (43)
w_ghece10 (44)
w_ghece10 (45)
w_ghece10 (46)
w_ghece10 (47)
w_ghece10 (48)
w_ghece10 (49)
w_ghece10 (50)
w_ghece10 (51)
w_ghece10 (52)
w_ghece10 (53)
w_ghece10 (54)
w_ghece10 (55)
w_ghece10 (56)
w_ghece10 (57)
w_ghece10 (58)
w_ghece10 (59)
w_ghece10 (60)
w_ghece10 (61)
w_ghece10 (62)
w_ghece10 (63)
w_ghece10 (64)
w_ghece10 (65)
w_ghece10 (66)
w_ghece10 (67)
w_ghece10 (68)
w_ghece10 (69)
w_ghece10 (70)
w_ghece10 (71)
w_ghece10 (72)
w_ghece10 (73)
w_ghece10 (74)
w_ghece10 (75)
w_ghece10 (76)
w_ghece10 (77)
w_ghece10 (78)
w_ghece10 (79)
w_ghece10 (80)
w_ghece10 (81)
w_ghece10 (82)
w_ghece10 (83)
w_ghece10 (85)
w_ghece10 (86)
w_ghece10 (84)
w_ghece10 (87)
w_ghece10 (1)
w_ghece10 (2)
w_ghece10 (3)
w_ghece10 (4)
w_ghece10 (5)
w_ghece10 (6)
w_ghece10 (7)
w_ghece10 (8)
w_ghece10 (9)
w_ghece10 (10)
w_ghece10 (11)
w_ghece10 (12)
w_ghece10 (13)
w_ghece10 (14)
w_ghece10 (15)
w_ghece10 (16)
w_ghece10 (17)
w_ghece10 (18)
w_ghece10 (19)
w_ghece10 (20)
w_ghece10 (21)
w_ghece10 (22)
w_ghece10 (23)
w_ghece10 (24)
w_ghece10 (25)
w_ghece10 (26)
w_ghece10 (27)
w_ghece10 (28)
w_ghece10 (29)
w_ghece10 (30)
w_ghece10 (31)
w_ghece10 (32)
w_ghece10 (33)
w_ghece10 (34)
w_ghece10 (35)
w_ghece10 (36)
w_ghece10 (37)
w_ghece10 (38)
w_ghece10 (39)
w_ghece10 (40)
w_ghece10 (41)
w_ghece10 (42)
w_ghece10 (43)
w_ghece10 (44)
w_ghece10 (45)
w_ghece10 (46)
w_ghece10 (47)
w_ghece10 (48)
w_ghece10 (49)
w_ghece10 (50)
w_ghece10 (51)
w_ghece10 (52)
w_ghece10 (53)
w_ghece10 (54)
w_ghece10 (55)
w_ghece10 (56)
w_ghece10 (57)
w_ghece10 (58)
w_ghece10 (59)
w_ghece10 (60)
w_ghece10 (61)
w_ghece10 (62)
w_ghece10 (63)
w_ghece10 (64)
w_ghece10 (65)
w_ghece10 (66)
w_ghece10 (67)
w_ghece10 (68)
w_ghece10 (69)
w_ghece10 (70)
w_ghece10 (71)
w_ghece10 (72)
w_ghece10 (73)
w_ghece10 (74)
w_ghece10 (75)
w_ghece10 (76)
w_ghece10 (77)
w_ghece10 (78)
w_ghece10 (79)
w_ghece10 (80)
w_ghece10 (81)
w_ghece10 (82)
w_ghece10 (83)

W Hotel Amman is a 125 metres tall up-scale hotel by W Hotels, currently under construction in the district of Al-Abdali, in Amman, Jordan. It is part of Abdali Project. It is planned to open in October 2017. The Hotel will feature luxurious apartments, 280 luxurious rooms, restaurants, gym, spa and a pool deck.

Some of the tasks that we successfully completed during the construction:

Mechanical works:

  • First fix works for drainage system (installing the concealed toilet and bidets) for the typical floors.
  • First fix works for water supply system.
  • Installing drainage system networks.
  • Installing chilled and heating system networks. (Pipes and FCU,s)
  • Installing firefighting system networks. (Sprinklers and landing valves risers)
  • Installing water supply system networks.
  • Installing all pressurization and smoke fans.
  • Ducting works.
  • Insulation and cladding works.
  • Installing GRP tanks.
  • Installing the softener room.
  • Installing ETS room with 8 heat exchangers and 9 pumps. At basement 3.
  • Installing 7 calorifier cylinders. At basement 3.
  • Installing domestic system. At basement 3.
  • Installing domestic system at level 30i.
  • Installing 4 heat exchangers, 4 pumps and 8 calorifier cylinders at level 30i.
  • Installing firefighting pumps room. At basement 8.
  • Installing firefighting pumps room. At level 30i.
  • Installing the pipe works, energy meters and controllers for the for district side in the ETS room.
  • Third fix works (sanitary fixture for the all the typical floors in the guest rooms)

Electrical works:

We accomplished at the retail area the following systems:

  • Lighting system
  • Evacuation and fire alarm system
  • CCTV system
  • Power system
  • Data system